No surprise invoices
Scope, exclusions and milestones are agreed in writing. If the work grows, we quote the change before doing it.
A written scope before any code is cut, a factory test before anything touches production, and a documentation package you can hand to a new hire.
Principles
Scope, exclusions and milestones are agreed in writing. If the work grows, we quote the change before doing it.
Drawings, I/O schedules, commented source and operator procedures ship with the project, not after chasing.
Logic is simulated and reviewed before commissioning. Production is not a debugging environment.
Training is included, and we would rather your technicians solve the next fault without calling us.
The engagement
Twenty minutes. We ask which machine hurts, how often it stops, what has already been attempted and who owns maintenance. You receive a written summary the same day, including an honest note if we are not the right firm for the job.
Half a day to a full day on the floor. We photograph panels, collect existing drawings, export fault histories and interview operators on two shifts where possible. Deliverable: findings memo with quantified loss estimates.
Deliverables, assumptions, exclusions, milestone dates, price and acceptance criteria. Alternatives are priced separately so you can choose the phase-one that fits the budget.
Electrical drawings, panel BOM, network topology, tag naming standard and HMI wireframes issued for your review. Nothing is ordered until you sign the design set.
Panels built by our UL 508A partner shops, logic developed and simulated, screens reviewed with operators. FAT executed against a written test script you keep.
Start-up scheduled around production, including nights and weekends. Site acceptance signed line by line. Operators trained on the machine, not in a meeting room.
We stay reachable for a month at no extra charge, then hand over as-built drawings, commented source, backups and procedures. Optional retainer starts after.
Standards & practice
We are an independent consultancy, not a certification body — but our deliverables are built to recognised practice so your internal reviewers and insurers can follow them.
Deliverables checklist
| Item | Format |
|---|---|
| As-built electrical drawings | DWG + PDF |
| PLC program, commented | Native project file |
| HMI / SCADA project | Native project file |
| I/O schedule & tag database | XLSX + CSV |
| Network topology & device inventory | |
| FAT / SAT test scripts, signed | |
| Operator & maintenance procedures | PDF + printed cards |
| Backup / restore instructions |
Send drawings, a fault log or just a description of the problem. You will get a written response from an engineer — not a sales script — within one business day.