How we work

A written scope before any code is cut, a factory test before anything touches production, and a documentation package you can hand to a new hire.

Principles

Four commitments we do not negotiate

No surprise invoices

Scope, exclusions and milestones are agreed in writing. If the work grows, we quote the change before doing it.

Documentation is a deliverable

Drawings, I/O schedules, commented source and operator procedures ship with the project, not after chasing.

Test off-line first

Logic is simulated and reviewed before commissioning. Production is not a debugging environment.

Your team owns it after

Training is included, and we would rather your technicians solve the next fault without calling us.

The engagement

Stage by stage

  1. Discovery call — day 0

    Twenty minutes. We ask which machine hurts, how often it stops, what has already been attempted and who owns maintenance. You receive a written summary the same day, including an honest note if we are not the right firm for the job.

  2. Site assessment — week 1

    Half a day to a full day on the floor. We photograph panels, collect existing drawings, export fault histories and interview operators on two shifts where possible. Deliverable: findings memo with quantified loss estimates.

  3. Fixed-scope proposal — week 2

    Deliverables, assumptions, exclusions, milestone dates, price and acceptance criteria. Alternatives are priced separately so you can choose the phase-one that fits the budget.

  4. Detailed design — weeks 2–5

    Electrical drawings, panel BOM, network topology, tag naming standard and HMI wireframes issued for your review. Nothing is ordered until you sign the design set.

  5. Build & factory acceptance — weeks 4–10

    Panels built by our UL 508A partner shops, logic developed and simulated, screens reviewed with operators. FAT executed against a written test script you keep.

  6. Commissioning — planned window

    Start-up scheduled around production, including nights and weekends. Site acceptance signed line by line. Operators trained on the machine, not in a meeting room.

  7. Stabilisation & handover — 30 days

    We stay reachable for a month at no extra charge, then hand over as-built drawings, commented source, backups and procedures. Optional retainer starts after.

Standards & practice

The references we design against

We are an independent consultancy, not a certification body — but our deliverables are built to recognised practice so your internal reviewers and insurers can follow them.

  • NFPA 79 for industrial machinery electrical design
  • UL 508A construction through certified partner panel shops
  • ANSI/RIA R15.06 practice for robot cell safeguarding
  • ISA-88 for batch and sequence structure, ISA-95 for data models
  • IEC 62443 principles applied to OT network segmentation and remote access
  • Client QMS and change-control procedures where validation applies

Deliverables checklist

What lands in your hands

ItemFormat
As-built electrical drawingsDWG + PDF
PLC program, commentedNative project file
HMI / SCADA projectNative project file
I/O schedule & tag databaseXLSX + CSV
Network topology & device inventoryPDF
FAT / SAT test scripts, signedPDF
Operator & maintenance proceduresPDF + printed cards
Backup / restore instructionsPDF

Tell us about the line that keeps you awake